BonanzaSystem installed November 2020. 1x HDS60 control unit, 4 transducers on box coolers, 2 on the sea chests
SardanaInstallad: September 2020 System: 2 x HDS20 + 1 x HDS120, 16 transducers, in wet area with custom made flanges
Kraanspoor buildingInstallation date: April 2020, Amsterdam, 1 x DS20 control-unit, 2 transducers industrial air-conditioning intake pipe